Ck Tsang

Technical Director, Aurecon
Shaft Design and Construction Methods

Shaft Design and Construction Methods

Mr. Tsang has over 20 years of experience in a wide range of projects. The tunnel projects where CK was leading design work, acting as adviser or involved in construction stage support include the 14 m diameter subsea TBM tunnels and the biggest (17.6 m diameter) TBM tunnel for Tuen Mun-Chek Lap Kok Link project in Hong Kong, the Hong Kong-Zhuhai-Macao Link project in China, the Shatin-Central Link cross harbour immersed tunnel in Hong Kong.

Share with your social network.